Share
To share this item click the button below:
Supporting Materials
Resolution No. 2010-003 - Authorizing the Executive Director to Execute Contract Change Order No. 1 for the Natomas Levee Improvement Program - Sacramento River East Levee Phase 1B (Reaches 2 through 4B), Elkhorn Irrigation Canal Phase 1 Relocation and Giant Garter Snake/Drainage Canal Phase 1 Construction Project, Sacramento County and Sutter County, CA. - Contract 4032, with Independent Construction (Bassett)
Files
PDF Document  Resolution No. 2010-003 - Authorizing the Executiv - C4032 NLIP SREL-1B Reach 2-2B Elkhorn 1 GGS 1 Levee Improv CCO1.bd.doc
PDF Document  Resolution No. 2010-003 - Authorizing the Executiv - C4032 NLIP SREL-1B Reach 2-2B Elkhorn 1 GGS 1 Levee Improv CCO1.rs.doc