Share
To share this item click the button below:
Supporting Materials
Contract No. 4195, Accept The Low Bid And Authorize The District Engineer To Execute The Contract With Caggiano General Engineering, Inc., For The Construction Of The Anatolia Force Main Hydrogen Sulfide Mitigation Project, (Control Number 2013-70075) (D. Nottoli)
Files
PDF Document  Co 4195 Caggiano Bid Award BDL.docx
PDF Document  Co 4195 Caggiano Bid Award VM ATT A.pdf
PDF Document  Item #9 Executed Material.pdf
PDF Document  item # 9 fully executed material.pdf