MONDAY                                     April 23, 2012                                      5:30 PM

COMMISSIONERS:  ERIC GUERRA, ALLAN HOSHIDA, PATRICK MAXFIELD, ALEX LAIEWSKI, (ONE VACANCY)

 

 

The on-line version of the agenda and associated materials are posted for your convenience at http://www.agendanet.saccounty.net/sirepub/meetresults.aspx?meettype=County Planning Commission Meetings.  Some documents may not be posted on-line because of their size and/or format (maps, site plans, and renderings).  As they become available, hard copies of all documents are available at the Clerk of the Board’s Office, 700 H Street, Room 2450.

SUMMARY OF RULES OF PROCEDURE

 

AGENDA: The Chairperson may reschedule items on the agenda.  Order of the agenda will be: non-contested matters, contested matters, then staff presentations.

CONDUCT OF HEARINGS: The sequence for a contested matter is: (1) staff report and environmental document discussion; (2) testimony of proponent(s); (3) public testimony; (4) rebuttal by applicant; (5) close of public hearing; (6) Commission discussion and vote.

LIMITED TIME FOR DISCUSSION: A principal proponent will be allowed a 5-minute statement.  Other proponents and opponents are allowed 3-minute statements except that a spokesperson for any group may be allowed 5 minutes.  The principal proponent shall have a 3-minute rebuttal.

VOTING: Any action or recommendation of the Commission requires a majority (3 votes) of the Commission to concur therein.  Any motion for approval or disapproval of a matter which results in a tie vote shall be forwarded to the Board of Supervisors with no recommendation.

ADDRESSING THE COMMISSION: Any person addressing the Commission shall, when recognized by the Chairperson, step to the rostrum and give their name and address.  Statements which lack factual support and repeated or cumulative testimony should be avoided.  Groups of people with similar viewpoints are urged to appoint a spokesperson to represent their views.

EXHIBITS OR DOCUMENTS: Documentary evidence submitted to the Commission becomes the property of the Commission.

CONTINUANCES: The Commission may continue any matter at its discretion.

 

Matters under the jurisdiction of the Commission and not on the posted agenda, may be addressed by the general public following completion of the regular agenda and any off agenda matters before the Commission for consideration.  The Commission limits testimony on matters not on the agenda to three minutes per person and not more than fifteen minutes for a particular subject.

 

COMPLETE RULES OF PROCEDURE

ARE AVAILABLE FROM THE COMMISSION SECRETARY.

 

Meeting facilities are accessible to persons with disabilities.  Requests for interpreting services, assistive listening devices or other considerations should be through the Clerk of the Board's office by calling (916) 874-5411 (voice) and CA Relay Services 711 (for the hearing impaired), no later than five working days prior to the meeting.

 

PLEDGE OF ALLEGIANCE

 

 

 

 

NON-CONTESTED

 

 

1.

08-REB-UPB-00016 - (VINEYARD / GAMEL)

RECLAMATION PLAN AMENDMENT AND USE PERMIT AMENDMENT

(Approval by the Planning Commission is a recommendation only.  Final approval is by the Board of Supervisors.)

 

THIS ITEM WILL BE CONTINUED TO MAY 21, 2012

 

TEICHERT LAND COMPANY - Applicant: Teichert Aggregates - Representative: Taylor And Wiley Attorneys - located at the southwest corner of Fruitridge Road and Mayhew Road, in the Vineyard community.

 

ASSESSOR'S PARCEL NOS.:

063-0080-016, 028 through 032; 063-0090-007 and 012

 

PROJECT NAME:

Aspen III South

 

CPAC RECOMMENDATION:

On April 10, 2012, the Vineyard Community Planning Advisory Council (CPAC) recommended APPROVAL of the proposed amendments by a vote of 3-0.

 

ENVIRONMENTAL DOC.:

Draft Supplemental Environmental Impact Report

 

REQUEST:

A Reclamation Plan Amendment for an aggregate mining operation known as Aspen III South approved in 1999 (Control No. 94-UPB-0484) to allow:

 

a.       A revision to the drainage and wetland mitigation plans for the project site that will include the construction of a Morrison Creek Realigned Channel (mining of the creek bed was approved in 1999) that will be approximately 300 feet in width at or near original grade, and will include adjacent buffer lands for a total width of 650 feet.  This new Morrison Creek Realigned Channel will accommodate 100-year flood flows and incorporate wetland/riparian habitat mitigation elements.

b.       The previously approved elevated bypass channel for Morrison Creek, and the 600-foot wide pit floor riparian corridor would be superseded with the construction of the new Morrison Creek Realigned Channel, as described above.

c.       Selected pit floor elevations may be raised to within 2 feet of the original grade over the term of the use permit (i.e., 22 years) using the “drying bed” method (i.e., the accumulation of silt-like material obtained from aggregate washings or direct import).

    A Use Permit Amendment to the Aspen III South approval to allow:

a.       Amendments to several of the conditions of the original approval that reference the approved elevated bypass channel for Morrison Creek and a 600-foot wide pit floor riparian corridor, and instead reference the new Morrison Creek Realigned Channel, as described above.

b.       An update of several conditions to reflect the 2011 Morrison Creek Hydrology and Hydraulic Analysis prepared for the project.

c.       An update of several conditions to reflect landscape plans approved for the project in 2002 (Control No 01-PAB-0686).

d.       An update of several conditions to reflect new wetland and oak woodland mitigation consistent with recent approvals by the U.S. Army Corps of Engineers.

 

 

 

2.

08-REB-UPB-ZGB-00017 - (VINEYARD / GAMEL)

RECLAMATION PLAN AMENDMENT, USE PERMIT AND ZONING AGREEMENT AMENDMENT, AND RELEASE

(Approval by the Planning Commission is a recommendation only.  Final approval is by the Board of Supervisors.)

 

THIS ITEM WILL BE CONTINUED TO MAY 21, 2012

 

TEICHERT LAND COMPANY - Applicant: Teichert Aggregates - Representative: Taylor And Wiley Attorneys - located at the northeast corner of Mayhew Road and Elder Creek Road, in the Vineyard community.

 

ASSESSOR'S PARCEL NOS.:

063-0100-001, 011, 014, 015, 016, 019; 063-0130-001, 002, 009, 010, 011

 

PROJECT NAME:

Aspen IV South

 

CPAC RECOMMENDATION:

On April 10, 2012, the Vineyard Community Planning Advisory Council (CPAC) recommended APPROVAL of the proposed amendments by a vote of 3-0.

 

ENVIRONMENTAL DOC.:

Draft Supplemental Environmental Impact Report

 

REQUEST:

A Reclamation Plan Amendment for an aggregate mining operation known as Aspen IV South approved in 1999 (Control No. 90-CZB-UPB-1607) to allow:

a.       A revision to the drainage and wetland mitigation plans for the project site that consists of completely avoiding Morrison Creek on the Aspen IV South property and constructing a “Raised Bank Channel”.  Teichert will mine up to the southern edge of the floodway of Morrison Creek, and will construct berms outside of the floodway on the north and south sides of the creek to create a Raised Bank Channel.

b.       The previously approved elevated bypass channel for Morrison Creek, and the 600-foot wide pit floor riparian corridor would be superseded with the construction of the Raised Bank Channel, as described above.

c.       Selected pit floor elevations may be raised to within 2 feet of the original grade over the term of the use permit (i.e., 22 years) using the “drying bed” method (i.e., the accumulation of silt-like material obtained from aggregate washings or direct import).

d.       Two options for on-site retention of stormwater: (a) drain to the adjacent Vineyard I mining site (this option was approved in 1999), or (b) retain on-site in an engineered retention basin.

A Use Permit Amendment and Zoning Agreement Amendment to the Aspen IV South approval to allow:

a.       Amendments to several of the conditions of the original approval that reference the previously approved elevated bypass channel for Morrison Creek and a 600-foot wide pit floor riparian corridor, and instead reference the new Raised Bank Channel, as described above.

b.       An update of several conditions to reflect the 2011 Morrison Creek Hydrology and Hydraulic Analysis prepared for the project.

c.       An update of several conditions to reflect landscape plans approved for the project in 2002 (Control No 01-PAB-0686).

d.       An update of several conditions to reflect new wetland and oak woodland mitigation consistent with recent approvals by the U.S. Army Corps of Engineers.

e.       A revision to conditions requiring the dedication of a public trail easement corresponding to the alignment of Morrison Creek.

A Release from the prior Zoning Ordinance, adopted by Ordinance No. SZC 99-0068, to be replaced by an amended Zoning Ordinance.

 

 

 

3.

05-CZB-UPB-REB-ZGB-0062 - (VINEYARD / GAMEL)

COMMUNITY PLAN AMENDMENT, REZONE, USE PERMIT AMENDMENTS, RECLAMATION PLAN AMENDMENT, USE PERMIT AMENDMENT WITH ZONING AGREEMENT AMENDMENT, AND RELEASE

(Approval by the Planning Commission is a recommendation only.  Final approval is by the Board of Supervisors.)

 

THIS ITEM WILL BE CONTINUED TO MAY 21, 2012

 

GRANITE CONSTRUCTION COMPANY - Representative:  David Temblador - located at the northeast corner of Hedge Road and Elder Creek Road, in the Vineyard community.

 

ASSESSOR'S PARCEL NOS.:

063-0080-010 through 013; 063-0090-001 through 003, 006, 009, 010, 011, 015 through 019; 063-0110-001 through 006, 012, 028, 029

 

PROJECT NAME:

Granite - Vineyard I

 

CPAC RECOMMENDATION:

On April 10, 2012, the Vineyard Community Planning Advisory Council (CPAC) recommended APPROVAL of the proposed amendments by a vote of 3-0.

 

ENVIRONMENTAL DOC.:

Draft Supplemental Environmental Impact Report

 

REQUEST:

A Community Plan Amendment and corresponding Rezone to change the designations from Industrial Reserve with Surface Mining Combining (IR(SM)) and Industrial Reserve with Flood Combining (IR(F)) to Industrial Reserve with Surface Mining/Flood Combining (IR(SM)(F)) for 5.61 acres (i.e., APN: 063-0090-009 and 18) of the project site.

A Use Permit Amendment for an aggregate mining operation known as Vineyard I approved in 2000 (Control No. 91-CZB-UPB-0118) to allow aggregate mining on an additional 5.61 acres, and to incorporate this new area into the previously approved mining plan.

A Reclamation Plan Amendment to the Vineyard I approval to allow:

a.       The additional 5.61 areas proposed for mining to be incorporated into the previously approved reclamation plan.

b.       A revision to the drainage and wetland mitigation plans for the project site that will include the construction of a Morrison Creek Realigned Channel (mining of the creek bed was approved in 2000) that will be approximately 300 feet in width at or near original grade, and will include adjacent buffer lands for a total width of 650 feet.  This new Morrison Creek Realigned Channel will accommodate 100-year flood flows and incorporate wetland/riparian habitat mitigation elements.

c.       The previously approved elevated bypass channel for Morrison Creek, and the 600-foot wide pit floor riparian corridor would be superseded with the construction of the new Morrison Creek Realigned Channel, as described above.

d.       Fill (overburden) will be added to portions of the pit floor to bring these areas to within 5 feet of original grade.

e.       A stormwater retention basin designed to accommodate 297-acre feet of water will be added to a portion of the pit floor.

A Use Permit Amendment and Zoning Agreement Amendment to the Vineyard I approval to allow:

a.       Amendments to several of the conditions of the original approval that reference an approved elevated bypass channel for Morrison Creek and a 600-foot wide pit floor riparian corridor, and instead reference the new Morrison Creek Realigned Channel, as described above.

b.       An update of several conditions to reflect the 2011 Morrison Creek Hydrology and Hydraulic Analysis prepared for the project.

c.       An update of several conditions to reflect new wetland and oak woodland mitigation consistent with recent approvals by the U.S. Army Corps of Engineers.

d.       A revision to conditions requiring the dedication of a public trail easement corresponding to the alignment of Morrison Creek.

A Release from the prior Zoning Ordinance, adopted by Ordinance No. SZC 2000-0001, to be replaced by an amended Zoning Ordinance.

 

 

 

4.

09-UPP-SPP-DRS-00096 - (NORTH HIGHLANDS / DEMORALES)

USE PERMIT, SPECIAL DEVELOPMENT PERMIT, AND DESIGN REVIEW

 

UKRAINIAN CHURCH OF THE EVANGELICAL CHRISTIAN BAPTISTS - Applicant/Engineer: Kravets Development Group - located at 5540 Date Avenue, on the southeast corner of Palm Avenue and Date Avenue, in the North Highlands community.

 

ASSESSOR'S PARCEL NOS.:

228-0091-006, 015, 025, 026, 027 (portion)

 

PROJECT NAME:

Ukrainian Church of the Evangelical Christian Baptists

 

CPAC RECOMMENDATION:

The North Highlands/Foothill Farms Community Planning Advisory Council (CPAC) met on June 23, 2009 and recommended APPROVAL (6-0-0) of the proposed project.

 

ENVIRONMENTAL DOC.:

Negative Declaration

 

REQUEST:

A Use Permit to allow the expansion of an existing church, including the construction of a 399-seat, 2-story sanctuary building, with classrooms and office, on approximately 2.2 acres in the RD-10 (Residential) zone.

 

A Special Development Permit to deviate from the following development standard:  Reduce the landscape planter required along the public street frontage from 24-26 total feet to approximately six (6) feet, pursuant to Section 320-05(a) of the Zoning Code.

 

A Design Review to comply with the Commercial and Mixed Use Community Design Guidelines.

 

 

CONTESTED

 

 

5.

10-UPB-PAP-SPP-PWP-DRS-ABE-00251 - (CARMICHAEL / GREGORY)

USE PERMIT, DEVELOPMENT PLAN REVIEW, SPECIAL DEVELOPMENT PERMIT, MAP WAIVER, DESIGN REVIEW, AND ABANDONMENT

(Approval by the Planning Commission is a recommendation only.  Final Approval is by the Board of Supervisors.) (Continued from 3-26-12, Item 1)

 

THIS ITEM WILL BE CONTINUED TO JULY 9, 2012

 

BAYGELL PROPERTIES - located at 4717 Engle Road, on the north side of Engle Road at Mission Avenue, approximately 360 feet west of Gibbons Park Way, in the Carmichael community.

 

ASSESSOR'S PARCEL NOS.:

256-0040-031, 032

 

PROJECT NAME:

Villas at Engle & Mission

 

CPAC RECOMMENDATION:

The Carmichael-Old Foothill Farms Community Planning Advisory Council (CPAC) met on May 18, 2011 and recommended APPROVAL (3-1).

 

Adjacent CPAC Recommendation:

The Arden Arcade CPAC decided not to review the proposed project.

 

ENVIRONMENTAL DOC.:

Negative Declaration

 

REQUEST:

A Use Permit to allow a 66-unit senior living condominium project on approximately 3.05 acres in the BP (NPA) (Business Professional, Mission Oaks Neighborhood Preservation Area) zone.

 

Development Plan Review for a 66-unit senior living condominium project pursuant to Section 532-014 of the Mission Oaks Neighborhood Preservation Area Ordinance.

 

A Special Development Permit for an Alternative Design, pursuant to Section 305-24 of the County Zoning Code.

 

A Waiver from the requirement for a Subdivision Map (tentative and final) for condominiums, as allowed by the County Land Development Ordinance, Title 22, Section 22.20.076.

 

Design Review to comply with the County’s Multi-Family Design Guidelines.

 

An Abandonment of an existing Irrevocable Offer of Dedication (I.O.D.) and a 30-foot right-of-way along the west property line.  (Note:  The abandonment is included for advertisement purposes only and will need to be processed through a separate Abandonment application.)

 

 

 

MISCELLANEOUS

 

 

6.

PLANNING DIRECTOR'S REPORT

 

 

7.

MISCELLANEOUS SCHEDULING MATTERS

 

 

 

 

 

 

 

 

 